The objective is: 
37542
The running time is: 
2.29321
The time meeting best is: 
0.142863
Location: 1(load: 144) 
 Route 0(load: 144) 12 13 17 19 15 16 18 10 11 
Location: 3(load: 158) 
 Route 0(load: 41) 2 8 9 
 Route 1(load: 117) 6 14 7 4 1 3 5 0 
The actual cost is 37542
